Lagos-Ibadan Rail to begin operations with 16 trips daily – NRC

The Nigerian Railway Corporation (NRC) says it will commence skeletal operations on the Lagos-Ibadan Standard Guage Rail line from the middle of September with 16 trips daily. The Managing Director of NRC, Mr Fidet Okhiria disclosed this on Saturday in Ibadan during an inspection tour of the project by the Ministers of Transportation, Mr Rotimi Amaechi, and Information and Culture, Alhaji Lai Mohammed.

Okhiria said that since the track laying had been completed between Ebute-Metta Junction (EBJ) in Lagos and Ibadan with stations under construction, the operation would start between Yaba in Lagos and Ibadan.

“We will start by the middle of September from Yaba to Ibadan while the other construction finishing will continue.

“We already have 24 coaches and a set of DMUs (Diesel Multiple Units) made of eight coaches.

“With that, we intend to have 16 trips a day,” he said. (Vanguard)

Exit mobile version