Japan starts fuel removal from nuclear plant (BBC)

The operator of Japan’s Fukushima nuclear plant has begun removing nuclear fuel from one of the reactors that melted down after the devastating 2011 earthquake and tsunami.

Remotely controlled equipment is lifting fuel rods from a storage pool inside reactor number three.

The delicate work at the contaminated site is expected to take two years.

The next phase of the huge clean-up in reactor three will be to remove molten nuclear fuel that remains deep inside. Read more

Related posts

Biological mother ‘flips out’ when bride chooses adoptive parents to walk her down the aisle

China executes man who plowed car into crowds

Nelly defends decision to perform at Tump ball